COLUMN - For those working in the I.T. world, identifying waste can be tricky. However, starting by tackling over-production will help you to eliminate every other form of waste.


Words: Rodrigo Aquino, Lean Institute Brasil


In 1937, while working at Toyoda Automatic Loom Works, Taiichi Ohno heard a man say that the productivity of an American worker was nine times higher than a Japanese worker’s.

When, in 1945, Kiichiro Toyoda said the organization would catch up with the United States in three years (the car industry in Japan would not have survived otherwise, he claimed), Ohno found himself thinking about that gap in productivity. It was clear to him that the Japanese were doing something wrong and there was too much waste in Toyota’s processes.

If that waste could be eliminated, production would increase at once. This was Ohno’s assumption, which represented the moment the Toyota Production System was conceived.

As we know, Ohno saw seven types of waste: over-production, waiting, transportation, over-processing, inventory, motion, and defective products. He was certain that the complete elimination of these wastes would increase the efficiency of operations. To start, Toyota started to produce only what was necessary – that is, it tackled over-production before anything else.

There are certain environments, however, where the seven wastes are hard to detect. Unfortunately, IT is one of them. So what to do?

In his book Lean IT, Steve Bell adapted the seven wastes to information technology, also comparing them to manufacturing and office environments, as shown in Figure 1 (at the end of the book, you can find more specific examples that can help to clarify these concepts).

{popup}

Comparing waste in manufacturing, office and IT. Source: Bell, C. S. and Orzen, A. M. (2011), Lean IT - Enabling and Sustaining Your Lean Transformation (p. 57). New York: CRC Press

Steve also describes lean IT as based on two dimensions: one is outward-facing, to improve management and business processes, while the other is inward-facing, using principles and tools to improve operations, services and software development.

It is important to clarify this separation in order to understand in which area of IT the wastes are occurring. In the box below I present some examples of waste, categorized as inward or outward.

The worst waste in IT, manufacturing or office is indeed over-production, because with it come all the others.

Over-production is the first step towards creating awareness in people and towards facilitating the evolution of an organization. It’s what Toyota did when TPS was first introduced: starting with over-production, it tackled each one of the wastes.

To help a business improve, there is no need for supposedly revolutionary pieces of software or elaborate management systems. An unwavering resolve to tackle waste in its every form first will bring in the results.

As an example, imagine a factory that produces 200,000 pieces per month and manages to save two seconds per piece produced. The saving would be a staggering 111.11 hours: that would translate in less manpower deployed, less energy expenditure, and so on. After decreasing waste, cost reductions tend to follow naturally.

The same principle can be applied to an IT company if we take into consideration the amount of time wasted each day with unproductive meetings, phone calls, emails, etc. Calculate how much time this would be times the number of employees, consider a month's work, and you’ll see how big a number we are talking about.

No matter what type of organization you work for, understanding and eliminating waste is the core activity of any transformation.


THE AUTHOR

Rodrigo Aquino has worked in I.T. for 16 years. He holds an MBA in Software Engineering at University of São Paulo and is a graduate in Computer Science at the Pontifícia Universidade Católica de São Paulo. He's held the role of Coordinator of Information Technology at Lean Institute Brasil for over three years. He has worked with organizations including ICEC, Totvs, Wunderman, and Petrobras.


Read more

Lean delivery
January 15, 2019
Lean delivery

NOTES FROM THE GEMBA – After re-insourcing its bike repair workshop, a distribution center of France's La Poste has begun to recover long-lost knowledge about the work of mailmen and using it to innovate.

Continue reading
The story of the lean transformation of a crane manufacturer
July 6, 2016
The story of the lean transformation of a crane manufacturer

NOTES FROM THE GEMBA – In the past 15 months Terex Cranes has successfully initiated a lean transformation. Follow Catherine Chabiron on her gemba walk to see what this large company is doing to put learning at the heart of its activities.

Continue reading
Why there is no Lean Manifesto
February 20, 2017
Why there is no Lean Manifesto

FEATURE – Why doesn't lean have a manifesto? The authors highlight the core principles and values of lean thinking, but warn these can only go so far without the learning that comes from working every day towards solving the next problem.

Continue reading
Games as a way to coach and teach lean thinking
July 23, 2017
Games as a way to coach and teach lean thinking

FEATURE – Simulations and games can be extremely beneficial, so long as we use them to highlight and explain the underlying behaviors we must adopt if we are to successfully embrace lean... and not only the tools.

Continue reading

Read more

No items found.